        行業資訊 所在位置- 首頁-新聞中心-行業資訊鋼筋桁架樓承板安裝使用要注意什么?

        鋼筋桁架樓承板安裝使用要注意什么?

        發布時間:2023-05-20 來源:http://m.km6lz.com/

        施工順序
        Construction sequence
        平面施工順序:每層鋼筋桁架樓承板的鋪設宜根據施工圖起始位置向一個方向鋪設,后處理邊角部分。
        Plane construction sequence: The laying of each layer of steel truss floor support plate should be carried out in one direction according to the starting position of the construction drawing, and finally, the edges and corners should be treated.
        立面施工順序:隨主體結構安裝施工順序鋪設相應各層的鋼筋桁架樓承板。
        Facade construction sequence: Lay corresponding steel truss floor support plates for each floor in accordance with the installation and construction sequence of the main structure.
        鋼筋桁架樓承板安裝
        Installation of steel bar truss floor support plate
        適宜在下一節鋼柱及配套鋼梁安裝完畢后進行。
        It is suitable to proceed after the installation of the next section of steel columns and supporting steel beams.
        樓板鋪設前
        Before laying the floor slab
        濟南樓承板
        應按圖紙所示的起始位置放設鋪板時的基準線。對準基準線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應緊密,保證澆筑混凝土時不漏漿。
        The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
        鋼筋桁架樓承板就位之后
        After the steel truss floor support plate is in place
        應將其端部的豎向鋼筋及底模與鋼梁點焊牢固。沿板寬度方向將底模與鋼梁點焊,焊接采用手工電弧焊,間距不大于300mm。
        The vertical reinforcement and bottom formwork at its end should be firmly spot welded with the steel beam. Spot weld the bottom formwork with the steel beam along the width direction of the plate. Manual arc welding is adopted for welding, and the spacing is not more than 300mm.
        樓板鋪設前
        Before laying the floor slab
        應按圖紙所示的起始位置放設鋪板時的基準線。對準基準線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應緊密,保證澆筑混凝土時不漏漿。
        The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
        本文由濟南樓承板提供技術支持,更多的詳細精彩內容請點擊我們的網站  http://m.km6lz.com ,我們將會全心全意為您提供滿意的服務。
        This article is supported by Jinan Building Support Board. For more detailed and exciting content, please click on our website http://m.km6lz.com We will wholeheartedly provide you with satisfactory service.
        中文字幕亚洲一区二区三区| 亚洲国产精品成人久久蜜臀| 国产亚洲精品自在线观看| 亚洲国产成人久久精品大牛影视| 亚洲沟沟美女亚洲沟沟| 91亚洲国产成人久久精品网站| 久久亚洲精品成人777大小说| 九月丁香婷婷亚洲综合色| 精品亚洲一区二区| 亚洲va中文字幕无码久久不卡| 国产亚洲综合久久系列| 国产亚洲精品成人AA片新蒲金 | 国产亚洲大尺度无码无码专线| 亚洲国产一区二区三区| 亚洲精品无码成人片在线观看| 亚洲片国产一区一级在线观看| 亚洲综合最新无码专区| 国产精品亚洲综合专区片高清久久久 | 亚洲一区二区三区在线观看精品中文| 亚洲色婷婷综合开心网| 亚洲国产精品尤物YW在线观看| 亚洲日韩VA无码中文字幕| 国产亚洲精品不卡在线| 国产亚洲av人片在线观看| 亚洲女初尝黑人巨高清| 亚洲成色在线影院| 2022年亚洲午夜一区二区福利| 亚洲成AV人片久久| 91丁香亚洲综合社区| 亚洲风情亚Aⅴ在线发布| 337P日本欧洲亚洲大胆艺术图| 亚洲AV无码乱码精品国产| 久久99亚洲综合精品首页| 亚洲日韩欧洲无码av夜夜摸| 亚洲成av人片在线观看天堂无码| 国产亚洲美女精品久久久| 久久精品国产亚洲| 亚洲一卡2卡4卡5卡6卡残暴在线| 亚洲熟妇AV乱码在线观看| 亚洲av无码成人精品区在线播放 | 亚洲二区在线视频|