        鋼筋桁架樓承板安裝使用要注意什么?

        發布時間:2023-05-20 來源:http://m.km6lz.com/

        施工順序
        Construction sequence
        平面施工順序:每層鋼筋桁架樓承板的鋪設宜根據施工圖起始位置向一個方向鋪設,后處理邊角部分。
        Plane construction sequence: The laying of each layer of steel truss floor support plate should be carried out in one direction according to the starting position of the construction drawing, and finally, the edges and corners should be treated.
        立面施工順序:隨主體結構安裝施工順序鋪設相應各層的鋼筋桁架樓承板。
        Facade construction sequence: Lay corresponding steel truss floor support plates for each floor in accordance with the installation and construction sequence of the main structure.
        鋼筋桁架樓承板安裝
        Installation of steel bar truss floor support plate
        適宜在下一節鋼柱及配套鋼梁安裝完畢后進行。
        It is suitable to proceed after the installation of the next section of steel columns and supporting steel beams.
        樓板鋪設前
        Before laying the floor slab
        濟南樓承板
        應按圖紙所示的起始位置放設鋪板時的基準線。對準基準線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應緊密,保證澆筑混凝土時不漏漿。
        The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
        鋼筋桁架樓承板就位之后
        After the steel truss floor support plate is in place
        應將其端部的豎向鋼筋及底模與鋼梁點焊牢固。沿板寬度方向將底模與鋼梁點焊,焊接采用手工電弧焊,間距不大于300mm。
        The vertical reinforcement and bottom formwork at its end should be firmly spot welded with the steel beam. Spot weld the bottom formwork with the steel beam along the width direction of the plate. Manual arc welding is adopted for welding, and the spacing is not more than 300mm.
        樓板鋪設前
        Before laying the floor slab
        應按圖紙所示的起始位置放設鋪板時的基準線。對準基準線,安裝塊板, 并依次安裝其它板。樓板連接采用扣合方式,板與板之間的拉鉤連接應緊密,保證澆筑混凝土時不漏漿。
        The reference line for laying the board should be placed at the starting position shown on the drawing. Align the reference line, install the first board, and then install the other boards in sequence. The connection of the floor slab adopts a buckle method, and the hook connection between the slabs should be tight to ensure that there is no leakage during the pouring of concrete.
        本文由濟南樓承板提供技術支持,更多的詳細精彩內容請點擊我們的網站  http://m.km6lz.com ,我們將會全心全意為您提供滿意的服務。
        This article is supported by Jinan Building Support Board. For more detailed and exciting content, please click on our website http://m.km6lz.com We will wholeheartedly provide you with satisfactory service.
        美国毛片亚洲社区在线观看| 亚洲一级毛片视频| 日本亚洲色大成网站www久久| 337p欧洲亚洲大胆艺术| 亚洲AV无一区二区三区久久| 亚洲精品专区在线观看| 337p日本欧洲亚洲大胆人人| 亚洲日本在线电影| 亚洲日本成本人观看| 亚洲中文字幕无码久久| 亚洲综合av一区二区三区不卡| 色婷五月综激情亚洲综合| 激情内射亚洲一区二区三区爱妻| 久久久久精品国产亚洲AV无码| 亚洲国产av高清无码| 亚洲人成影院午夜网站| 亚洲国产91在线| 亚洲w码欧洲s码免费| 亚洲六月丁香六月婷婷色伊人| 亚洲欧洲日韩国产| 亚洲人成在线免费观看| 亚洲国产成a人v在线观看| 亚洲一级高清在线中文字幕| 久久亚洲精品国产精品婷婷| 亚洲欧洲AV无码专区| 国产偷国产偷亚洲高清在线| 亚洲AV伊人久久青青草原| 亚洲国产精品尤物yw在线| 日韩一卡2卡3卡4卡新区亚洲| 国产日产亚洲系列| 亚洲国产精品va在线播放| 亚洲精品免费在线观看| 亚洲熟妇无码久久精品| 亚洲一卡2卡4卡5卡6卡残暴在线| 久久亚洲精品专区蓝色区| 亚洲av综合av一区二区三区| 亚洲国产精品自产在线播放| 久久91亚洲人成电影网站| 78成人精品电影在线播放日韩精品电影一区亚洲 | 亚洲精品国产高清在线观看| 亚洲av成本人无码网站|