從事濟(jì)南彩鋼板房,彩鋼瓦,復(fù)合板,巖棉板,C型鋼,濟(jì)南鋼結(jié)構(gòu)的廠家
        服務(wù)電話:0531-83658718
        熱門搜索:濟(jì)南方管,濟(jì)南彩鋼瓦,濟(jì)南巖棉板,濟(jì)南型鋼,濟(jì)南樓承板,濟(jì)南泡沫復(fù)合板
        公司動(dòng)態(tài) 所在位置- 首頁(yè)-新聞中心-公司動(dòng)態(tài)樓承板閉口與開(kāi)口樓承板比較板型截面優(yōu)勢(shì)

        樓承板閉口與開(kāi)口樓承板比較板型截面優(yōu)勢(shì)

        發(fā)布時(shí)間:2021-11-16 來(lái)源:http://m.km6lz.com/

        1.該板型板底平坦、腹板貼合,可根據(jù)各種房間的不同功用和需求供應(yīng)多種板底天花處理方式。
        1. The plate bottom of the plate type is flat and the web is fitted. A variety of plate bottom and ceiling treatment methods can be provided according to the different functions and needs of various rooms.
        2.樓承板閉口截面重心距板底16mm左右,小于開(kāi)口型或縮口型樓承板截面參數(shù),按塑性理論分析組合樓板結(jié)構(gòu)承載力時(shí),混凝土壓力合力中心與拉力合力中心具有更大的內(nèi)力臂,這表明資料強(qiáng)度發(fā)揮更充沛,因而閉口組合樓板具有更大的結(jié)構(gòu)承載力或者說(shuō)具有更高的安全系數(shù);
        2. The center of gravity of the closed section of the floor bearing plate is about 16mm away from the bottom of the plate, which is less than the section parameters of the open or shrinkage floor bearing plate. When the bearing capacity of the composite floor structure is analyzed according to the plastic theory, the concrete pressure resultant force center and tension resultant force center have a larger internal force arm, which indicates that the data strength is more abundant, Therefore, the closed composite floor has greater structural bearing capacity or higher safety factor;
        濟(jì)南樓承板
        3.閉口樓承板能夠徹底代替樓板中正彎矩受拉鋼筋而且無(wú)須噴刷防火涂料即可抵達(dá)2小時(shí)的耐火時(shí)效;
        3. The closed floor bearing plate can completely replace the tensile reinforcement with positive bending moment in the floor slab, and can reach the fire resistance aging of 2 hours without spraying fireproof paint;
        4.閉口樓承板肋角使混凝土對(duì)樓承板的握裹力更強(qiáng),組合樓板抵達(dá)實(shí)在的組合效果;
        4. The rib angle of the closed floor bearing plate makes the concrete have a stronger grip on the floor bearing plate, and the composite floor slab achieves a real combination effect;
        5.閉口樓承板組合樓板能夠減小樓板厚度,增大凈空高度。選用開(kāi)口樓承板,小板厚需126mm,而選用該板型小只需104mm;
        5. The closed floor bearing plate composite floor can reduce the floor thickness and increase the clearance height. Open floor bearing plate shall be selected, and the thickness of small plate shall be 126mm, while the minimum thickness of this plate type shall be 104mm;
        6.閉口樓承板一同的卡槽懸吊體系能為建筑物板底機(jī)電管道設(shè)備供應(yīng)便當(dāng),該體系無(wú)需在板底打眼或預(yù)埋鐵件,只需輕松將兩只卡片刺進(jìn)板底溝槽內(nèi),便可供應(yīng)200kg吊重吊點(diǎn),拆開(kāi)也很便當(dāng);
        6. The card slot suspension system together with the closed floor bearing plate can provide convenience for the electromechanical pipeline equipment at the bottom of the building plate. The system does not need to drill holes or embed iron parts at the bottom of the plate. It can provide 200kg lifting points by easily inserting two cards into the groove at the bottom of the plate, and it is also easy to disassemble;
        今天的分享就是關(guān)于濟(jì)南樓承板,更多的內(nèi)容小編會(huì)不斷的再此分享,更多的內(nèi)容請(qǐng)繼續(xù)關(guān)注我們:http://m.km6lz.com
        Today's sharing is about Jinan floor support plate. More content will be shared here. Please continue to pay attention to us: http://m.km6lz.com
        亚洲一区无码精品色| 国产偷国产偷亚洲高清人| 亚洲狠狠成人综合网| 亚洲日本va在线视频观看| 亚洲第一区精品日韩在线播放| 亚洲一区二区三区在线观看网站| 亚洲伊人久久大香线蕉影院| 99久久精品国产亚洲| 日韩亚洲Av人人夜夜澡人人爽 | 亚洲AV成人影视在线观看| 亚洲免费在线视频观看| 亚洲伊人久久大香线焦| 亚洲1区1区3区4区产品乱码芒果 | 亚洲精品永久www忘忧草| 久久精品亚洲精品国产色婷| 一区二区三区亚洲| 亚洲精品熟女国产| 亚洲乱码在线播放| 亚洲综合av一区二区三区| 亚洲综合一区国产精品| 亚洲日本在线电影| 国产精品亚洲AV三区| 亚洲XX00视频| 日韩亚洲变态另类中文| 亚洲乱亚洲乱妇无码麻豆| 国产亚洲av片在线观看播放 | 亚洲色欲啪啪久久WWW综合网| 亚洲码欧美码一区二区三区| 久久亚洲精品高潮综合色a片| 在线精品自拍亚洲第一区| 日韩精品电影一区亚洲| 中文字幕在亚洲第一在线| 亚洲乱码国产一区三区| 亚洲成a人片77777老司机| 亚洲精品**中文毛片| 久久亚洲最大成人网4438| 亚洲国产av玩弄放荡人妇| 日韩亚洲精品福利| 亚洲综合网站色欲色欲| 亚洲av日韩av激情亚洲| 亚洲电影在线免费观看|